Apply to use a site

Our customers include television and radio broadcasters, telecommunications operators and emergency service organisations.

You can lease space on towers and in transmitter halls throughout Australia or use our portal services. We offer flexible operations and maintenance options through to comprehensive fully managed services. Follow the process at right to enquire about sharing existing infrastructure on our sites.

We are ‘neutral host’ for a multitude of customers across a range of technologies utilising its transmission infrastructure. Co-location provides a cost-effective solution by integrating into structures already on the ground and in operation.

1. Are you considering co-locating on one of our sites?

Use SiteFinder for high-level information for site location and site ID. To help you with your planning, you can also contact our team for a .kmz file of our national site portfolio.

If you have already chosen a site, request a Site Information Pack (SIP). This pack will give you site photos, drawings and the space available. Please email us to request the SIP.

2. Your requirements

Please provide the following details:

Tower

  • What type of equipment would you like to install?
  • The make, model, quantity and the required height

Shelter

Will you be installing your own shelter? We can offer space in our shelter for your own rack or you can share an existing rack.

Electrical Power

We offer power sharing as an additional, along with connection to our back-up generators where available. Please check with our team.

3. Ready to submit your application?

Download an application form and email it through to our site sharing team. One of us will then be in contact with you to confirm receipt of your application and next steps

Download mobile and radio communication application form

Download radio and TV broadcasters application form

4. What happens next?

You should have received your application approval email containing:

  • Your project ID for online site access application
  • Drawings with approved equipment locations

Things we need from you:

  • For Construction (FC) drawings
  • A signed site licence for your equipment

Please keep in mind:

RF and electrical power outages may be required as a condition of your installation. Please enquire with our planned outages team.

5. As-built documentation

As built drawings and photos are important parts of closing off your application. It helps us to keep site information up to date for the next installation.

Need help or advice?
Donn Cardozo

Account Manager,

Telco

Direct: +61 (0)2 8113 4791

Email
Steven Wibisono

Account Manager,

Commercial Broadcasters

Direct: +61 (0)2 8113 4983

Email